FPSO Almirante Tamandare

General Information


Basin: Santos Basin

Position:

Lat: 24° 44' 520" S

Long: 042° 30' 780" W

Heading: 189 °

VHF Channel: None

Contact details:

Email 1: csupt.fpsotamandare@sbmoffshore.com

Email 2: csupv.fpsotamandare@sbmoffshore.com

Email 3: oim.fpsotamandare@sbmoffshore.com

Email 4: radio.fpsotamandare@sbmoffshore.com

Email 5: fiscal.at@petrobras.com.br

PRS Fwd


DARPS ID: 294

TDME 1: 450.5250 MHz

TDME 2: 450.5250 MHz

Time Slot: 4

Time Slot: 8

DARPS Info:


Artemis/XPR:

Address Code:

3

Freq Pair:

33

Artemis Info:


Fanbeam Info:


Radius Info:

PRS Aft


DARPS ID: 295

TDME 1: 450.6250 MHz

TDME 2: 450.6250 MHz

Time Slot: 4

Time Slot: 8

DARPS Info:


Artemis/XPR:

Address Code:

2

Freq Pair:

22

Artemis Info:


Fanbeam Info:


Radius Info:

Cargo


Cargo Name: Buzios

Discharging rate: 7200 cbm/hr

Cargo API: 28.0

Cargo dens @ 20 °C: 0.8786

Cargo temp: 36°C

Cargo BSW: %


Fwd Station:

Qty of Hose Flushing: cbm

Qty of Line displacement: cbm


Aft Station:

Qty of Hose Flushing: cbm

Qty of Line displacement: cbm


Cargo Info:

Cargo details as follows: API – 28. Density @ 20Deg C - 0.8786 Temperature – 36 Deg C Salinity – 152.3 mg/l H2S - NA.


General Remarks:

Condition 1 - If DPST Slop tank is Full / partially full-on arrival (to receive FPSO line flushing), then we will follow below steps after completion of leak test: a. FPSO will send 95 m3 of initial Line Displacement (AFT Station) or 215 m3 of initial Line Displacement (FWD Station) - To be received in Non-Loading Slop Tank. b. Offloading operation. c. FPSO will send 150 m3 of Line flushing water to DPST. d. No Backflush operation e. Hose disconnection and Unmooring. Condition 2 - If DPST Slop tanks are Empty on arrival (to receive FPSO line flushing & Line Displacement), then we will follow below steps after completion of leak test. a. FPSO will send 150 m3 of Line flushing water to DPST to be received in first empty Slop tank. b. FPSO will send 95 m3 of initial Line Displacement (AFT Station) or 215 m3 of initial Line Displacement (FWD Station) - To be received in Non-Loading Slop Tank. c. Offload operation. d. DPST to send back the line displacement followed by 150 m3 of backflushing water. e. Hose disconnection and Unmooring.


You need to be logged in user in order to edit the FPSO