Location: Praia Mole Port area in Vitória, featuring a protected area with a 25-meter draft, suitable for VLCC.
Capacity: Up to 14 million tons of oil per year (approximately 100 million barrels).
Operation Type: Focused on ship-to-ship (STS) transfer, helping to place Espírito Santo on the global oil export route.
Timeline: The project was presented in May 2025 with an estimated operation start in 2028 - https://datamarnews.com/noticias/new-port-to-put-espirito-santo-on-the-oil-export-map/